loading

10 Years+ Experience, Custom Stone Processing Machinery & Equipment Supplier

How to Build a Sandstone Production Line

Quick Answer

For quarry owners expanding into stone processing, landscape stone manufacturers increasing production capacity, or investors planning a new sandstone processing plant, building a sandstone production line involves far more than purchasing individual machines.

A successful sandstone production line is built by first defining the finished products, production objectives, production workflow, and factory layout before selecting equipment. The most efficient production lines are designed as complete manufacturing systems in which every stage—from raw block preparation and primary cutting to material handling and future expansion—works together to achieve stable quality, high productivity, and long-term operational reliability.

The following guide outlines the key engineering decisions involved in planning a sandstone production line for landscape and dimensional stone processing, helping factory owners make informed investment decisions before purchasing equipment.


Introduction

Sandstone is widely used to manufacture landscape stone, paving, walling stone, curbs, steps, coping, building stone, veneers, and many other architectural products. Although these products differ significantly in size, thickness, and processing requirements, the principles behind an efficient sandstone production line remain remarkably consistent.

Many sandstone production line projects fail to achieve their expected productivity not because of machine performance, but because critical planning decisions were made before the first machine was installed. Selecting equipment before defining production objectives often results in inefficient material flow, unnecessary handling, production bottlenecks, and costly modifications as production requirements evolve.

Experienced sandstone processors approach production line planning differently. Rather than selecting individual machines first, they begin by defining the finished products, expected production capacity, sandstone characteristics, and long-term business objectives. These engineering requirements form the foundation for equipment selection, production workflow, factory layout, and future expansion.

Building a sandstone processing line is therefore an engineering planning process rather than an equipment purchasing exercise. The objective is to develop a manufacturing system in which equipment, material flow, production capacity, and factory layout work together to support stable production, efficient operations, and sustainable long-term production efficiency.

The following sections examine the key engineering decisions involved in building a sandstone production line—from defining production objectives and designing the production process to selecting equipment, planning factory layout, and avoiding common planning mistakes. These principles are widely applied in modern sandstone processing plants and provide a practical framework for developing an efficient and scalable production system.


Define Your Production Goals Before Selecting Equipment

One of the most common mistakes in sandstone factory planning is selecting equipment before clearly defining production objectives. While comparing machine specifications and prices may seem like a logical starting point, successful production lines are almost always designed around manufacturing requirements rather than individual machines.

Before evaluating any sandstone processing equipment, factory owners should first determine four key engineering factors: the finished products they plan to manufacture, the expected production capacity, the characteristics of the sandstone being processed, and the potential for future business expansion. These decisions influence every subsequent stage of production line planning, from equipment selection and factory layout to material handling and long-term operating costs.

Determine Your Finished Products

Every sandstone production line begins with the final product, not the first machine.

Although many factories process the same raw sandstone blocks, the required equipment can differ significantly depending on what the factory intends to produce. A landscape stone production line has very different engineering requirements from one manufacturing building stone, thin veneers, or large architectural panels.

For example, factories producing paving stones, walling stone, curbs, steps, and coping generally require equipment capable of processing thick slabs efficiently while maintaining high throughput. In contrast, factories specializing in architectural cladding or thin veneers often place greater emphasis on cutting accuracy, thickness consistency, and surface quality. Factories manufacturing dimensional building stone often fall somewhere between these two production models, requiring both productivity and dimensional consistency.

Clearly defining the product mix before purchasing equipment helps ensure that every machine supports the intended production process rather than creating unnecessary capacity or workflow limitations.

Figure 1. Common Sandstone Products for Landscape and Dimensional Stone Processing

Common sandstone products for landscape stone production, including sandstone ashlar bricks, sandstone pavers, thin veneer, wall cladding, flagstone, stair treads, landscaping stone, and raw sandstone blocks.

Estimate Production Capacity

Production capacity should be determined by market demand and long-term business objectives rather than the maximum capacity advertised by machine manufacturers.

Oversizing equipment often increases initial investment, energy consumption, maintenance costs, and factory space requirements without improving overall productivity. Conversely, undersized equipment can quickly become a production bottleneck as production demand grows.

A practical planning method is to begin with the required daily or annual output of finished products and then work backwards through the production process. By estimating how many square meters, linear meters, or individual stone products must be delivered each day, factory planners can determine the cutting capacity required at each production stage while allowing sufficient time for blade changes, material handling, machine maintenance, and routine production interruptions.

This engineering approach produces a more balanced production line than simply selecting the largest available machine. The objective is not to maximize the capacity of a single saw, but to balance the capacity of the entire production system.

Evaluate Sandstone Characteristics

Not all sandstone behaves the same during processing.

Geological origin, quartz content, cementation, hardness, abrasiveness, moisture content, and natural fractures all influence cutting performance, tooling selection, equipment configuration, and production efficiency.

In our production experience, quartz-rich or strongly cemented sandstone can create more demanding cutting conditions for diamond tooling and may require adjustments to blade specification, feed rate, and machine configuration.

Evaluating these material characteristics before equipment selection helps determine appropriate cutting methods, blade specifications, machine configuration, and production workflow. It also reduces the likelihood of unexpected production problems after installation.

Plan for Future Expansion

A sandstone production line should not only satisfy today's production requirements but also provide sufficient flexibility for future business growth.

Many factories gradually expand their product range, increase production capacity, or introduce additional processing stages as customer demand changes. If factory layout, utilities, and material handling systems are designed only for current production, future expansion often requires costly equipment relocation, production interruptions, or major factory modifications.

A practical engineering approach is to reserve adequate floor space for additional equipment, allow sufficient crane coverage for future production areas, and design material flow with expansion in mind. These considerations add little complexity during the initial planning stage but can significantly reduce future investment costs while maintaining production continuity.

Planning for expansion from the beginning enables the production line to evolve with the business instead of becoming a limitation on future growth.

Table 1. Production Objectives and Engineering Requirements
Production Objective Engineering Consideration
Finished Products Determines the production process and equipment selection
Production Capacity Determines the required capacity balance across the production line
Sandstone Characteristics Influences cutting methods, blade selection, and machine configuration
Future Expansion Supports long-term capacity growth and operational flexibility

Choose Equipment for Each Production Stage

Selecting sandstone cutting equipment is often considered the first step in building a sandstone production line. In reality, equipment selection should follow production planning rather than precede it.

A typical sandstone production line consists of four production stages: block preparation, primary block cutting, secondary cutting, and secondary processing. Each stage serves a different engineering objective and therefore requires different sandstone processing equipment, production capacity, and operating priorities.

Rather than asking "Which machine should I buy?", factory planners should ask a more practical engineering question:

"What equipment is required at each stage of the production process, and what criteria should be used to select it?"

Viewing equipment as part of an integrated production system helps improve production balance, reduce bottlenecks, and support future factory expansion.

Block Preparation

The objective of block preparation is to prepare quarry blocks for efficient downstream processing. Depending on the finished products, sandstone characteristics, and production method, block preparation may involve sorting, selective preparation, or block trimming rather than following a fixed procedure.

Sort and Classify Quarry Blocks

Before cutting begins, sandstone blocks should be sorted according to both material characteristics and production requirements.

Blocks with similar hardness, abrasiveness, or cutting characteristics are often grouped together to maintain consistent cutting parameters, improve diamond blade performance, simplify production scheduling and reduce unnecessary machine adjustments during production.

At the same time, blocks should also be classified according to the intended manufacturing process. Blocks that require trimming to create reference faces or improve positioning are separated from those that can proceed directly to primary cutting. This allows each production batch to follow the most appropriate preparation process while reducing unnecessary handling.

Trim Blocks When Necessary

Not every sandstone block requires trimming before primary cutting.

When trimming is required, bridge-type trimming saws and diamond wire saw machines are two commonly used solutions. Bridge-type trimming saws are generally more suitable for blocks that are already roughly shaped and only need reference faces, unstable sections removed, or limited dimensional correction. Diamond wire saw machines are better suited to oversized, highly irregular, or difficult-to-position blocks where greater cutting flexibility is required.

However, many sandstone products—particularly those designed to retain natural edges or irregular appearances—can proceed directly to primary cutting without a separate trimming operation. The decision to trim, and the choice between a trimming saw and a wire saw, should therefore be based on block condition, finished product requirements, and the subsequent processing method.

Primary Block Cutting

The purpose of primary cutting is to convert large sandstone blocks into thick slabs, smaller blocks, or other semi-finished products suitable for downstream processing. The most appropriate equipment depends primarily on the finished products, production volume, and production workflow—not simply on block size.

Factories producing landscape stone, curbs, walling stone, steps, and other dimensional products often prioritize continuous production and efficient material handling. In these situations, walking gantry block saws and single-blade block saws typically provide an effective balance between productivity, flexibility, and operational reliability.
For most sandstone production lines, a heavy-duty block saw is generally regarded as a production requirement rather than a premium option. Sandstone cutting often involves abrasive materials, deep cutting, and long operating shifts, creating sustained loads on the machine structure, guide rails, drive system, bearings, and spindle assembly. Sufficient structural rigidity and long-term mechanical stability are therefore essential for maintaining consistent cutting performance and reducing unexpected downtime.

In landscape and dimensional sandstone production focused on thick slabs, smaller blocks, and downstream value-added products, gang saws and multi-blade block cutting systems are used far less frequently than single-blade block saws. From both a mechanical and production perspective, multi-blade cutting systems are optimized for continuous thin slab production rather than repeatedly processing thick slabs or dividing blocks into smaller sections.

Figure 2. Heavy-Duty Walking Gantry Block Saw for Continuous Cutting of Sandstone Blocks into Thick Slabs

Heavy-duty walking gantry block saw continuously cutting sandstone blocks into thick slabs for downstream processing.

Secondary Cutting

After primary cutting, thick slabs, smaller blocks, or other semi-finished sandstone products are further processed into their final dimensions according to production requirements. Depending on the finished products, this stage focuses on production efficiency, product consistency, and manufacturing flexibility.

For factories producing standard landscape stone products such as paving stones, ashlar, curbs, coping, steps, and walling stone, medium-sized block cutting machines (typically equipped with 800–1600 mm diamond blades) are commonly used. These machines provide high productivity and are particularly suitable for repetitive production of standard-sized products.

Heavy-duty bridge saws are another common solution for secondary cutting, particularly when greater production flexibility is required. Bridge saw selection depends primarily on the finished products rather than the machine itself. For straight cutting and standard dimensional products, a 3-axis bridge saw is often sufficient. When production includes curved profiles, circles, or other complex shapes, 4-axis or 5-axis bridge saws provide greater machining flexibility.

The choice between 3-axis, 4-axis, and 5-axis bridge saws should therefore be determined by product diversity, production volume, and processing complexity rather than by machine specifications alone.

For a more detailed discussion of bridge saw selection, see our guide "Do You Really Need a 5-Axis Bridge Saw?"

Secondary Processing

Secondary processing converts cut sandstone into finished products ready for packaging or installation. Unlike the previous cutting stages, which focus primarily on material conversion, secondary processing is intended to increase product value and expand market applications. Depending on the finished products, this stage may include hydraulic splitting, thin veneer production, and other value-added operations.

For landscape stone production, hydraulic splitting machines are widely used to create natural split surfaces for products such as walling stone, ashlar, and landscaping blocks. The required splitting force depends primarily on stone thickness, material characteristics, and the desired surface finish rather than overall factory output.

Thin veneer saw machines are commonly used when the production line includes thin natural stone veneers for wall cladding and architectural applications. By accurately slicing thicker sandstone into thin veneer products, these machines increase material utilization while enabling manufacturers to produce higher-value products for residential and commercial building projects.

Because customer requirements vary significantly between landscape stone, building stone, and architectural applications, the final processing equipment should always be selected according to product specifications rather than following a fixed equipment configuration.

Although these operations occur at the end of the production line, they frequently determine product quality, market value, and customer acceptance.

Table 2. Equipment Selection by Production Stage
Production Stage Typical Equipment Primary Selection Consideration
Block Preparation Diamond Wire Saw, Bridge-Type Trimming Saw Block size, geometry, stability, and trimming requirements
Primary Block Cutting Walking Gantry Block Saw, Single-Blade Block Saw Finished products, capacity, sandstone characteristics, and operating hours
Secondary Cutting Bridge Saw, Medium-Sized Block Cutting Machine Product dimensions, volume, accuracy, and processing flexibility
Secondary Processing Hydraulic Splitting Machine, Thin Veneer Saw Product specifications and value-added processing

Plan Factory Layout for Efficient Material Flow

Purchasing the right equipment does not automatically create an efficient sandstone production line. Poor factory layout can still reduce productivity through unnecessary material handling, repeated loading, crossing transport routes, and machine idle time. An efficient sandstone plant should therefore be designed around continuous material flow rather than individual machine placement.

Instead of asking only where each machine should be installed, factory planners should consider how blocks, thick slabs, smaller blocks, and finished products will move through each production stage with the fewest handling steps and interruptions. The objective is to allow machines to operate as independently as possible while maintaining a clear and continuous production sequence.

Viewing the equipment as part of an integrated production system helps improve machine utilization, reduce bottlenecks, simplify material handling, and leave greater flexibility for future production expansion.

Organize the Factory Around Material Flow

The production process should determine the factory layout. Raw sandstone blocks should enter the production line once and move progressively through block preparation, primary cutting, secondary cutting, and secondary processing without unnecessary backtracking or crossing transport routes.

In practice, an efficient sandstone factory normally follows a single-direction material flow, with each production stage feeding the next in sequence. A semi-finished buffer area between primary and secondary cutting allows the two stages to operate at different production speeds without one machine repeatedly waiting for the other.

Every unnecessary forklift movement adds handling time, labor requirements, equipment wear, and the risk of material damage. In many factories, improving material flow between these stages delivers greater productivity gains than increasing the cutting speed of any single machine.

Separate Raw Materials, Production, and Finished Products

Raw blocks, semi-finished materials, and finished products should be stored in separate functional zones. Raw block storage should be located close to the primary cutting area, semi-finished buffer storage should support secondary cutting operations, and finished product storage should remain close to packing and loading areas.

When these materials share the same working space, forklifts compete for the same routes, materials are handled repeatedly, and finished products may obstruct active production areas. Clear separation improves traffic control, production scheduling, material tracking, and overall factory safety.

Leave Space for Material Handling

Machines do not occupy the entire factory—material handling does. Factory planners must reserve sufficient working space for forklift travel and turning, overhead crane operation, block positioning, blade replacement, maintenance access, and temporary storage of semi-finished materials.

Many production bottlenecks are caused not by insufficient machine capacity, but by inadequate working space around the equipment. A cutting machine may be ready to operate while the unloading area is blocked, the crane is occupied, or a forklift cannot safely approach the loading position.

Material-handling corridors, loading zones, crane coverage, and maintenance access should therefore be planned together with machine foundations, electrical connections, and water systems. Correcting these problems after production begins is usually more expensive and disruptive.

Reserve Space for Future Expansion

A sandstone factory designed only for its current production capacity can become difficult and expensive to expand later. Many factories begin with one primary cutting machine and gradually add secondary cutting equipment, bridge saws, splitting machines, thin veneer production, or additional storage as demand increases.

Whenever practical, the original layout should reserve space for additional cutting stations, expanded semi-finished and finished product storage, wider crane coverage, and future forklift traffic. This space can initially be used for temporary storage or material handling, provided that future equipment access, foundations, power supply, and production routes remain available.

Planning for future expansion during the original factory design usually requires limited additional investment but can prevent major reconstruction, interrupted production, and inefficient equipment placement later.

Figure 3. Typical Sandstone Production Line Layout and Material Flow

typical sandstone processing factory layout and material flow


Common Mistakes When Building a Sandstone Production Line

Many sandstone production line mistakes begin with decisions that appear logical during the planning stage, such as reducing initial equipment cost, adding more blades, or placing production stages too close together.

In practice, these decisions can reduce cutting stability, equipment utilization, and long-term production efficiency. Identifying these mistakes before equipment is ordered can prevent costly redesigns, workflow bottlenecks, and unnecessary operating costs.

Mistake 1: Choosing Equipment Based Only on Purchase Price

One of the most common mistakes when planning a sandstone production line is selecting equipment primarily according to its initial purchase price rather than its long-term production performance.

A conventional machine may reduce the initial investment, but it may not be designed for the continuous loading, abrasive cutting conditions, and long operating hours common in sandstone production. Under these conditions, lower structural strength or lighter-duty components can lead to more frequent maintenance, unstable cutting performance, and repeated production interruptions.

The initial price difference should therefore be evaluated against the machine’s expected service life, maintenance requirements, component durability, and production downtime. In sandstone processing, the lowest purchase price does not necessarily result in the lowest production cost.

Mistake 2: Trying to Increase Primary Cutting Efficiency with Multiple Blades

One common mistake when planning a sandstone production line is attempting to increase primary cutting efficiency by installing multiple large blades on a block saw.

We have discussed this approach with many factory owners and investors. A common proposal is to fit a 3600 mm block saw with three or four blades, with blade spacing of approximately 170 mm, 200 mm, or more, assuming that cutting several thick slabs in one pass will significantly increase production capacity.

From an engineering perspective, this approach is generally unsuitable for sandstone production.

Unlike granite or marble slab production, many sandstone production lines in this application range focus on thick slabs and smaller blocks rather than large volumes of thin slabs. Each additional blade creates another deep cutting kerf, causing total cutting force, spindle torque, power demand, and slurry volume to increase simultaneously. Maintaining equal blade alignment and load distribution also becomes more difficult as blade diameter and cutting depth increase. As a result, feed speed may need to be reduced to control vibration, blade deflection, binding, and main motor loading.

For most sandstone production lines producing thick slabs and smaller blocks, single-blade cutting is generally the more practical, flexible, and reliable engineering solution.

Figure 4. Single-Blade vs Multi-Blade Load Logic in Sandstone Cutting

Comparison of single-blade and multi-blade sandstone block cutting, showing increased cutting force, spindle torque, slurry volume, vibration, and main motor load when multiple large blades cut simultaneously.

Mistake 3: Designing an Inefficient Production Workflow

One of the most common planning mistakes is designing the production workflow around machine placement rather than continuous production.

For example, some factory planners install the primary cutting saw and the secondary cutting saw on the same rail system, believing that placing the two machines closer together will improve production efficiency and reduce material handling.

At first glance, this arrangement appears logical. In practice, however, it creates a workflow bottleneck.

When thick slabs or smaller blocks are transferred from the primary cutting stage to the secondary cutting stage, both machines must stop while loading, unloading, and positioning operations are carried out. Instead of operating independently, the two production stages become linked by the same handling process, causing repeated interruptions throughout the production cycle.

As production volume increases, these interruptions accumulate, reducing equipment utilization and limiting the overall capacity of the production line. The bottleneck is therefore not the cutting machines themselves, but the workflow connecting them.

An efficient sandstone production line should allow each production stage to operate as independently as possible, with material handling designed to support continuous production rather than interrupt it.

The objective of factory layout is therefore not to create the shortest material route, but to create the most efficient production workflow. In many sandstone factories, improving workflow delivers greater productivity than simply reducing the distance between machines.

Choose a Machinery Partner Based on Production Requirements

Building a sandstone production line involves more than purchasing individual machines. Equipment capacity, factory layout, material handling, installation conditions, and future expansion are closely connected. A supplier focused only on machine quotations may overlook whether downstream cutting, handling systems, and available workshop space can support the proposed equipment configuration.

A qualified machinery partner should first understand the factory’s sandstone characteristics, finished products, block dimensions, target capacity, available space, and planned production stages. The supplier should also recognize that heavy-duty construction is often a production requirement in sandstone processing, not merely an optional machine upgrade.

Technical support should be evaluated both before and after installation. Before equipment is ordered, the supplier should be able to provide layout recommendations, foundation requirements, and electrical and water specifications. After delivery, the factory may require installation guidance, operator training, spare-parts availability, and direct access to engineers for troubleshooting.

Relevant project experience is equally important. Machines with similar specifications may perform very differently under abrasive sandstone, deep cutting conditions, and continuous production. Factory owners should therefore review comparable installations, production videos, engineering drawings, and customer cases rather than relying only on catalog specifications.

Choosing a machinery partner should follow the same logic as choosing equipment: define the production requirements first, then evaluate whether the supplier can support them. The right partner helps identify production conflicts before equipment is ordered, matches each machine to its actual production role, and provides technical support throughout years of operation.


Conclusion

Building an efficient sandstone production line begins with clearly defining the finished products, target capacity, sandstone characteristics, and future expansion plans. These production goals should determine equipment selection, factory layout, and material-handling methods—not the reverse.

Primary cutting equipment must be capable of operating reliably under abrasive materials, deep cutting conditions, and long production shifts. Secondary cutting and processing equipment should then be selected according to the required product dimensions, surface appearance, and value-added applications. Equipment selection, material handling, production capacity, and factory layout should be planned together, not separately.
The machinery partner should also understand the operating demands of sandstone processing and be capable of supporting equipment selection, installation planning, commissioning, and long-term technical service. Equipment capacity, workflow, installation conditions, and after-sales support should be evaluated as parts of one complete production system.

The most effective sandstone production line is not necessarily the one with the largest machines, the highest number of blades, or the shortest distance between equipment. It is the production system that matches the factory’s products, maintains stable operation, and allows materials to move efficiently from raw blocks to finished products. Careful planning before equipment purchase can reduce bottlenecks, control long-term operating costs, and provide a flexible foundation for future expansion.


FAQ

What equipment is needed for a sandstone production line?

A typical sandstone production line includes block sorting and preparation, a heavy-duty block saw for primary cutting, and suitable equipment for secondary cutting. Depending on the finished products, it may also include bridge-type trimming saws, diamond wire saw machines, medium-sized block cutting machines, bridge saws, hydraulic splitting machines, or thin veneer saws.

Does every sandstone block need to be trimmed before cutting?

No. Blocks should be trimmed only when reference faces, dimensional correction, or the removal of unstable sections are required. Bridge-type trimming saws and diamond wire saw machines can both be used, while irregular blocks intended for natural-edge landscape products may proceed directly to primary cutting.

What is the best machine for primary sandstone cutting?

For most sandstone production lines producing thick slabs and smaller blocks, a heavy-duty single-blade block saw is generally the most stable and flexible solution. Heavy-duty construction is particularly important where abrasive sandstone, deep cutting, and long production shifts create continuous mechanical loading. The machine should be selected according to block size, cutting depth, sandstone abrasiveness, required output, and expected operating hours.

Are multi-blade block saws suitable for sandstone production?

Generally, multi-blade block saws are not the preferred solution for sandstone production focused on thick slabs and smaller blocks. Multiple large blades increase total cutting force, spindle loading, heat generation, and the difficulty of maintaining equal blade alignment. During deep cutting, feed speed may need to be reduced to control vibration, blade deflection, binding, and main motor overload.

What is the difference between primary and secondary sandstone cutting?

Primary cutting divides quarry blocks into thick slabs, smaller blocks, or other semi-finished products. Secondary cutting processes these materials into final dimensions such as pavers, ashlar, walling stone, steps, caps, veneer pieces, and other finished products.

How should sandstone production capacity be calculated?

Production capacity should be calculated from the required finished-product output rather than from the rated capacity of one machine. Start with the target daily output, then calculate the cutting, handling, labor, and buffer capacity required at each production stage. Blade changes, maintenance, loading time, material variation, and normal production interruptions should also be included.

Why is factory layout important in sandstone production?

Factory layout determines whether each production stage can operate independently or must wait for shared forklifts, cranes, loading zones, or transfer operations. Poor layout can reduce equipment utilization even when every machine has sufficient cutting capacity.

Why is a semi-finished buffer area necessary?

A semi-finished buffer area separates primary and secondary cutting operations. It allows each production stage to operate at its own pace and prevents one machine from stopping simply because the next stage is temporarily unavailable.

About the Author

Andrew An

Founder & Stone Machinery Engineering Consultant | 10+ Years of Stone Machinery Industry Experience  

WISDOM MACHINERY

Andrew has more than 10 years of experience in the stone machinery industry and works directly with stone processing factories worldwide. He specializes in heavy-duty stone processing solutions, customized production lines, factory layout optimization, and long-term production system planning.

Areas of Expertise

  • Stone Cutting Machines
  • Stone Production Lines
  • Factory Layout Optimization
  • Granite Processing
  • Sandstone Processing
  • Landscape Stone Production
  • Customized Stone Machinery

📧 Email: andrew@wsdmachinery.com

📱 WhatsApp: +86-15960408060

Follow Andrew An on LinkedIn for more insights on heavy stone processing, or Contact Us for technical consultations.

prev
How to Improve Sandstone Production Efficiency?

Table of Contents

recommended for you
Get in touch with us
Wisdom Machinery is a professional manufacturer of high-quality stone processing machines.
CONTACT US
Contact Person: Andrew An
Phone Number: +86-15960408060
WhatsApp: +86-15960408060
Address: 486th Wuliqiao Road, Wuli Bridge Development Zone, Shuitou Town, Nan'an City, Fujian Province, China
+86-15960408060
Contact us
email
whatsapp
Contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect